RESEARCH · Evulgare · NOT OFFICIAL EVIULON DOCTRINE

Autonomous Defensive Mission Control under Uncertainty: Perception, Tracking, Prediction, Safe Action Selection, Lost-Link Continuity, and Answerable Multi-Domain Simulation

Research section 3 of 7

  1. Drone Camera: Egocentric view mapping directly to the sensor's field of view.
  2. Chase Camera: Stabilized third-person view tracking the main agent.
  3. Overhead Tactical View: Orthographic top-down layout abstracting altitude.
  4. Topological View: A node-based representation graph ignoring physical geography to visualize governance and authority state relationships7.
  5. Mission-Control View: Multi-pane tiled dashboard showing cameras alongside metrics.
  6. Event-Follow Camera: Automatically pans to the highest-risk synthetic conflict identified by the RTA.
  7. Decision-Focus Camera: Zooms and holds on the spatial location where the governor intervened.
  8. Selected-Entity Focus: Locks the camera onto a user-clicked synthetic hazard.
  9. Comparison Camera Sync: Two viewports locked in spatial sync, showing the safe RTA run versus an unconstrained failure baseline7.
  10. WebXR View: Full immersive device API support.
  11. Non-XR Equivalent: Standard WebGL Canvas fallback for desktop.

15. Proof Inspector (Core Research Area 13)

The Proof Inspector is a continuous UI diagnostic layer that validates system architecture integrity during the deterministic run. Every proof card displays deep-linked properties to allow analysts to verify why a simulation passed or failed7.

Proof Inspector Field Description / Function
Proof ID & Statement e.g., "INV-01: Truth never directly seeds autonomy intent."
State Real-time binary evaluation: PASS, FAIL, or UNKNOWN.
Evidence Mathematical variable tracking (e.g., truth_leak_bytes = 0).
Assumptions & Defeaters The logical condition that would cause the proof to fail (e.g., "Memory read from WorldTruth detected").
Affected Event & Entity Links to the specific timestamp and UUID where the evaluation occurred.
Reason Codes Explains the result based on the canonical digest context.
Qualification Contextual mapping to institutional policies or lifecycle gates7.
Jump-to-Event UI button updating the chronological timeline dial to the exact evaluation tick.
Compare-Baseline UI button loading a counterfactual run where the proof was deliberately failed.
Raw Evidence Expandable modal displaying the raw JSON chunk evaluated for the proof.

16. Progressive Delivery and Performance Budgets (Core Research Area 14)

To ensure the analytical workbench is highly accessible globally without relying on heavy client infrastructure, the architecture implements aggressive progressive delivery strategies8.

Delivery Stage Budget Architectural Strategy
Initial HTML < 50 KB Delivers the core UI shell and CSS globally via CDN.
Initial JSON < 100 KB Fetches scenario registry and initial state parameters.
First Analytical State < 300 ms Renders narrative logs, metric tables, and proof states immediately prior to WebGL initialization.
First Frame (WebGL) < 1.5 s Compiles basic shaders and geometry for the 3D layer.
Complete Replay < 2 MB Utilizes compact transport and gzip for the full canonical manifest.
Hydration Verification < 50 ms Compares browser state hash against server digest hash.
Retry & Degraded N/A If WebGL context is lost, immediately falls back to Canvas 2D or DOM table representation8.
Mobile Memory Cap < 150 MB Employs aggressive GPU cleanup and garbage collection of stale track objects to prevent browser crashes.

17. Accessibility (Core Research Area 15)

The simulation architecture must remain fully analytically useful for users unable to engage with the 3D WebGL scene, ensuring strict parity between visual, narrative, and tabular views7.

Analytical Task Non-Visual Accessibility Strategy
Identify Hazards ARIA live regions announce HAZARD_DETECTED events immediately via screen reader.
Inspect Tracks Dynamically updating semantic HTML tables map track IDs to latency, staleness, and confidence metrics.
Compare Candidates Data tables present generated alternatives (LEFT_DEVIATION vs HOLD) side-by-side with calculated risk bands.
Understand Uncertainty Textual narrative output translates CP tubes into physical volume estimates (e.g., "95% confidence bounds reach 40 cubic meters").
Follow Timeline Keyboard-navigable sequential event logs allow logical stepping through the mission phase.
Inspect Proof Each proof card uses standard semantic HTML denoting PASS/FAIL state without relying on color indicators.
Issue Bounded Actions Supervisory toggles (e.g., force RTH) are standard HTML form inputs.
Export Evidence Direct API download links providing raw JSON and accessible CSV formats.
Complete Analytical Task The user can definitively confirm if the RTA intervened correctly relying solely on the Event Log and Proof Inspector.

18. The 35 Scenarios (Deliverable 16)

The following 35 deterministic scenarios guarantee comprehensive evaluation across diverse risk profiles and domains.

ID Domain Scenario Narrative Tested Core Function
A1 Aerial Single synthetic drone intercepts abstract static hazard. Baseline perception and primitive deviation.
A2 Aerial Multi-UAV uncoordinated swarm encounters high wind. Distributed CP bounds expansion10.
A3 Aerial Mid-flight total GPS denial in urban canyon. Sensor degradation and IMU dead-reckoning drift.
A4 Aerial Adversarial telemetry spoofing detected. OSR handling of conflicting data classification.
A5 Aerial High-speed head-on abstract conflict. RTA Simplex rapid baseline switching1.
A6 Aerial Persistent occlusion of tracked hazard behind a wall. Covariance expansion due to staleness.
A7 Aerial Latency on command link exceeds 2000ms. Degraded authority management5.
B1 Maritime Approaching vessel drops AIS broadcast. OSR categorization of UNKNOWN_THING11.
B2 Maritime Thick fog eliminates 90% of visual/LiDAR points. Evidential learning uncertainty scaling11.
B3 Maritime Narrow channel transit with traffic. Calculation of minimum normalized clearance.
B4 Maritime Synthetic rogue wave alters own kinematics instantly. Feedback-based CP rapid readjustment3.
B5 Maritime Complete comms loss with port control. Lost-link logic invoking maritime loiter hold.
B6 Maritime Multi-vessel convergence collision course. Candidate risk band prioritization.
B7 Maritime Detection of low-profile uncooperative craft. False negative recovery and track re-initialization.
C1 Satellite Debris cloud predicted intersection path. Ephemeris uncertainty ellipsoids via CP.
C2 Satellite Sensor blackout due to synthetic solar flare. Prolonged covariance expansion limits.
C3 Satellite Unexpected orbital decay detected. Baseline controller forced orbit raising16.
C4 Satellite Loss of ground station synchronization. SAFE_RETURN equivalent (safe orbit hold)5.
C5 Satellite Simultaneous debris alert and thermal fault. State machine resolution of competing priorities.
C6 Satellite Rendezvous approach with uncooperative payload. RTA minimum proximity boundary enforcement.
C7 Satellite Thruster misfire alters planned trajectory. Kinematic anomaly correction via pure reducers.
D1 Logistics Urban multipath interference scrambles tracking. Filter rejection of ghost tracks.
D2 Logistics Complete uplink/downlink severance en route. Full lost-link state transition to EXPIRED17.
D3 Logistics Pedestrian intrusion on designated synthetic pad. CP pedestrian trajectory evaluation19.
D4 Logistics CG imbalance simulated post-payload shift. Abort to PREDEFINED_MINIMUM_RISK_STATE.
D5 Logistics Local emergency command conflicts with remote input. Authority reconciliation logic.
D6 Logistics Dynamic no-fly boundary updated mid-flight. RTA geo-fence boundary violation prevention.
D7 Logistics Sensor blind spot entered during descent phase. HOLD condition enforced until confidence restores.
E1 Infra. Bridge inspection subject to sheer crosswinds. AC path penalty rejection by RTA21.
E2 Infra. Unknown structural anomaly visually detected. OSR mapping to semantic confidence layers.
E3 Infra. Complete visual odometry failure. Transition to high-uncertainty motion models.
E4 Infra. Dynamic crane boom enters operational volume. VERTICAL_DEVIATION generated and executed safely.
E5 Infra. Critical battery alert simulated during transit. Immediate override to SAFE_RETURN logic.
E6 Infra. Human operator issues an unsafe manual override. RTA governor rejects human input to prevent crash22.
E7 Infra. Multi-agent inspection path intersection. Distributed RTA negotiation preventing deadlock.

19. The 40 Proof Invariants (Deliverable 17)

Every proof dynamically reflects the runtime status of the system, asserting the structural integrity of the autonomy. These are continuously evaluated by the Proof Inspector7.

Source: Evulgare/Autonomous Mission Control Simulation.md · SHA-256: b9eb0281c880f3301bf722cbaa3a837e9ee928c4da2a4d60b18d0cdbf2c3168d